Benton, North Shields, Wallsend, West Moor

TEMPORARY RESTRICTION OF TRAFFIC ORDER 2026

North Tyneside Council gives notice that it has made Orders under Section 14 (1) of the Road Traffic Regulation Act 1984. The effect of the Orders prohibits all through traffic on the following, and as and when signage indicates:

Benton

Front Street Lane from the junction with Front Street to the rear of The Ship (PH). 

There is no alternative route. Access to be given when possible. 

The temporary Order is required for the patching of a manhole and will come into force on 16 November 2026 for a period not exceeding 1 day. 

Further information may be obtained via Lumsden & Carroll Civil Engineering on 07791359805. 

North Shields

  1. Appleby Street Lane

    An alternate route is available via Lawson Street, Burdon Main Row, Appleby Street.

    The temporary Order is required for a safe working area while a headframe and antennas are swapped out on a telephone mast and will come into force on 15 November 2026 for a period not exceeding 1 day. 

    Further information may be obtained via Centurion Traffic Management on 01132775360.

  2. Donkin Terrace Lane

    An alternate route is available via Park Terrace, Donkin Terrace.

    The temporary Order is required for an electrical service replacement and will come into force on 10 November 2026 for a period not exceeding 8 days.

    Further information may be obtained via Freedom on 01916755821.

  3. Stanley Street from Borough Road North to outside number 8 Stanley Street. 

    Resident access to be maintained via Rudyerd Street. 

    The temporary Order is required for tarmac patching and will come into force on 16 November 2026 for a period not exceeding 6 days. 

    Further information may be obtained via Paul McCutcheon on 0191 643 4815. 

Wallsend

  1. Charlotte Street Lane.

    An alternate route is available via Durham Street, Charlotte Street, North View Lane.

    The temporary Order is required for a cleanse and CCTV survey to the sewer and will come into force on 3 November 2026 for a period not exceeding 1 day.  

    Further information may be obtained via Esh Civils on 07837328954.

  2. Diamond Street Lane. 

    An alternate route is available via Harle Street, North Road, Douglass Street Lane. Access to be given when possible. 

    The temporary Order is required to carry out sewer repair works and then reinstate and will come into force on 30 November 2026 for a period not exceeding 5 days. 

    Further information may be obtained via Lumsden & Carroll Civil Engineering on 07791359805. 

  3. Ferndale Avenue Lane

    An alternate route is available via Durham Street West, Ferndale Avenue.

    The temporary Order is required for a cleanse and CCTV survey to the sewer and will come into force on 11 November 2026 for a period not exceeding 1 day. 

    Further information may be obtained via Esh Civils on 07837328954.

West Moor

Footpaths surrounding Georgian Court.

Alternate routes are available via the surrounding footpaths. 

The temporary Order is required for gas mains replacement works and will come into force on 2 November 2026 lasting until 15 January 2027. 

Further information may be obtained via Northern Gas Networks on 07807720117.

Whitley Bay

Hartley Lane from the junction with the A192 to the footpath entrance of the Brier Dene Farm.

Works are to be completed in sections, with access being maintained for the Beehive PH at all times.

An alternate route is available via North Tyneside Boundary To Earsdon Road Roundabout, Earsdon Road, Monkseaton Drive, The Links, Westley Avenue, Gerrard Road, Blyth Road, Hartley Lane, West End, Hartley Lane.

The temporary Order is required to install ducting and chambers within the carriageway and verge and will come into force on 16 November 2026 lasting until 31 December 2026. (Expected end date for works is the 30 November 2026).

30 October 2026

Director of Neighbourhoods 

Quadrant East, The Silverlink North, Cobalt Business Park, North Tyneside, NE27 0BY