For copies of any of the documents listed below please email strategic.property@northtyneside.gov.uk
Concept Plans
The initial ideas for development of the strategic sites at Killingworth Moor and Murton Gap were expressed in a preliminary Concept Framework, which was used to help guide the future master planning and delivery on these sites. The Concept Framework developed into Outline Development Frameworks that have been included on the Policies Map for the Local Plan.
Related documents
• Concept Framework Volume 1 2015
• Volume 2
• Volume 3
• Killingworth Moor and Murton Gap Outline Development Framework Part 1 2016
• Part 2
• Part 3
• Part 4
• Annex A
Infrastructure, Viability and Retail
The evidence provides an assessment of the infrastructure required to support the development of Murton Gap and Killingworth Moor and consider the viability aspects and retail capacity of the two sites.
Update the document to the Killingworth Moor and Murton Gap Viability and Deliverability Report.
Related documents
• Killingworth Moor and Murton Gap Infrastructure Delivery Plan 2016
• Utilities Assessment 2015
• Viability: Killingworth Moor and Murton Gap Viability and Delivery Report 2016
• Killingworth Moor and Murton Gap Viability and Delivery Report Appendix 2016
• Killingworth Moor and Murton Gap Retail Capacity 2016
Transport
The evidence assesses pedestrian and cycling infrastructure in and surrounding the strategic sites and opportunities to maximise travel by public transport and providing excellent pedestrian and cycling links to the key public transport nodes and interchanges.
Related documents
• Public Transport Study 2016
• Pedestrian / Cycling Study 2016
Ground Conditions
Related documents
• Killingworth Moor Phase 1 Geo-Environmental Desk Study Appendix A Drawings 2015
• Killingworth Moor Phase 1 Geo-Environmental Desk Study 2015
• Killingworth Moor Phase 1 Geo-Environmental Desk Study Appendix B Photographs 2015
• Killingworth Moor Phase 1 Geo-Environmental Desk Study Appendix C1 GroundSure Report 2015
• Killingworth Moor Phase 1 Geo-Environmental Desk Study Appendix C2 GroundsSure Report 2015
• Killingworth Moor Phase 1 Geo-Environmental Desk Study Appendix C3 GroundSure Report 2015
• Killingworth Moor Phase 1 Geo-Environmental Desk Study Appendix D BGS Borehole Records 2015
• Killingworth Moor Phase 1 Geo-Environmental Desk Study Appendix E Terraconsult Borehole Logs 2015
• Murton Gap Phase 1 Geo-Environmental Desk Study 2015
• Killingworth Moor Phase 1 Geo-Environmental Desk Study Appendix F Coal Authority Report and Mine Abandonment Plans 2015
• Murton Gap Phase 1 Geo-Environmental Desk Study Appendix A Figures and Drawings 2015
• Murton Gap Phase 1 Geo-Environmental Desk Study Appendix B Photographs 2015
• Murton Gap Phase 1 Geo-Environmental Desk Study Appendix C1 GroundSure Report 2015
• Murton Gap Phase 1 Geo-Environmental Desk Study Appendix C2 GroundSure Report 2015
• Murton Gap Phase 1 Geo-Environmental Desk Study Appendix C3 GroundSure Report 2015
• Murton Gap Phase 1 Geo-Environmental Desk Study Appendix D BGS Borehole Records 2015
• Murton Gap Phase 1 Geo-Environmental Desk Study Appendix E Coal Authority Report and Mine Abandonment Plans 2015
• Constraints and Topography 2015
Flooding
A broad scale flood risk and drainage assessment for both of the Strategic Sites, which aim to establish the baseline conditions and evaluate the effects of development.
Related documents
• Killingworth Moor Flood Risk and Drainage Assessment 2015
• Killingworth Moor Flood Risk Assessment: Appendix Key Overland Flow Paths 2015
• Killingworth Moor Flood Risk Assessment: Appendix SUD Opportunities 2015
• Killingworth Moor Flood Risk Assessment: Appendix Development Site Options 2015
• Murton Gap Flood Risk and Drainage Assessment 2015
• Murton Gap Flood Risk Assessment Appendix: Water Infrastructure 1 2015
• Murton Gap Flood Risk Assessment Appendix: Water Infrastructure 2 2015
• Murton Gap Flood Risk Assessment Appendix: Pond Storage Calculations 2015
• Murton Gap Flood Risk Assessment Appendix: Key Overland Flow Paths 2015
• Murton Gap Flood Risk Assessment Appendix: Flood Alleviation Scheme 2015
• Murton Gap Flood Risk Assessment Appendix: Development Site Option 1 2015
• Murton Gap Flood Risk Assessment Appendix: Development Site Option 2 2015
Heritage and Archeology
The potential impact of development on heritage assets such as buildings, monuments, places, areas or landscapes have been considered in a number of separate assessments for the Strategic Sites.
Related documents
• Killingworth Moor Heritage Statement 2015
• Murton Gap Heritage Statement 2015
• Killingworth Moor Archaeological Assessment 2015
• Murton Gap Archaeological Assessment 2015
Open Space
The Open Space assessments outline the quantum and quality of existing open space and recreation space in the area and the amount needed to meet demand created by the strategic sites.
Related documents
• Killingworth Moor Open Space Assessment
• Murton Gap Open Space Assessment